Change of Period in the Programming Grid
By following the steps described above, the schedule will be registered. To Change the Periods of the previously assigned schedule, you must access a previously created Scheduler, in which you want to Change the Periods described.

After accessing a Scheduler, the system will display the interface for adding Campaigns to the Scheduler, where you can Change the Periods by clicking on the button with a pencil icon.

After clicking on the button marked in the image above, the screen will be displayed, offering a variety of Templates that can be used to assign or change dates and times for the chosen Slide to be displayed. After editing, just click on the "Update" button to save the Changes made to the display Period.

By clicking on the 'Update' button, the system will recognize the update made, adding or Changing the dates and times in the Programming Grid.