Scheduler
📄️ Scheduler Registration
The first step in registering a scheduler is accessing the "Scheduler" tab. This function allows you to manage the playback of a sequence of Slides, giving you the flexibility to display the Slides at a time of your choosing.
📄️ Main Campaign
By selecting the "Campaigns" button, linked to the Main Campaign, you can include a Campaign of your choice. This will allow a slide belonging to the included Campaign to be displayed continuously until a Campaign is scheduled in the programming grid or a trigger is activated. In other words, the Campaign added in the "Main Campaign" space will be displayed until the scheduled programming in the grid begins, and after this programming ends, the Main Campaign will be displayed again. The Main Campaign may also be affected if a trigger is activated.
📄️ Programming Grid
By selecting the "Campaigns" button, linked to the Programming grid, it becomes possible to include a Campaign linked to a grid structure. In this functionality, the user has the ability to define a period for displaying each Campaign included. If the period defined by the user is exceeded, the next slide will be automatically displayed, if it is available for display.
📄️ Trigger Campaign
By selecting the "Campaigns" button, linked to Campaign by Trigger, it becomes possible to include a Campaign of your choice associated with a Trigger. This will allow the included Campaign to be displayed every time a specific action chosen by the User, such as a Trigger, is triggered.
📄️ Change of Period in the Programming Grid
By following the steps described above, the schedule will be registered. To Change the Periods of the previously assigned schedule, you must access a previously created Scheduler, in which you want to Change the Periods described.
📄️ Removing a Main Campaign
By following the steps described above, the Schedule will be registered. To Remove a Main Campaign, you need to access a previously created Schedule that you want to Remove the Campaign from.
📄️ Removing a Campaign from the Schedule
By following the steps described above, the schedule will be registered. To Remove a Campaign from the schedule, you need to access a previously created schedule to remove the Campaign associated with the schedule.
📄️ Removing a Trigger Campaign
By following the steps described above, the schedule will be registered. To Remove a Campaign by Trigger, you need to access a previously created Schedule that you want to Remove the Campaign associated with the Trigger.
📄️ Change Scheduler Information
In order to Change the Information included in the Scheduler, it is necessary to access the "Scheduler" tab and access the previously created Scheduler, directed to the record you wish to change the data for.
📄️ Inactivating the Scheduler
In order to inactivate the Scheduler, it is necessary to access the "Scheduler" tab and click on the three dots, directed to the Scheduler you wish to Inactivate, then click on "Inactivate".
📄️ Removing the Scheduler
To remove the scheduler, it is necessary to access the "Scheduler" tab and click on the three dots, directed to the Scheduler you want to remove, then click on "Move to Recycle Bin".